White Rock Water System Master Plan

The City of White Rock prepares a Water System Master Plan every five (5) years. The 2017 Water System Master Plan Update was approved by Council at the November 20, 2017, Regular Council Meeting. You can watch a presentation on the Master Plan at www.whiterockcity.ca/streaming

The scope of the 2017 update includes: 

  • Existing system demand development; 
  • Future system demand development; 
  • Hydraulic water model update; 
  • Review of water treatment options;
  • System evaluation including water main break history update; and, 
  • Recommended upgrades.

Read the plan: 2017 Water System Master Plan Update [4.4 MB]

 

Below, you will find the slides presented by Dr. Saad Jasim at the November 20, 2017, Regular Council Meeting. Click on the slides to enlarge them.